$10.5B

THE BOEING COMPANY

AL
Contract FY2026
NNM07AB03C
$10.5B
Obligated Amount
$4.4B
Award Value
Outlayed
Jun 18, 2026
Action Date
End Date
NAICS Code
FY2026
Fiscal Year

Contract Description

Provide developmental hardware and test articles, and manufacture and assemble ares i upper stages. the upper stage (us) element is an integral part of the ares i launch vehicle and provides the second stage of flight. the us element is responsible for the roll control during the first stage burn and separation; and will provide the guidance and navigation, command and data handling, and other avionics functions for the ares i during all phases of the ascent flight. the us element is a new design that emphasizes safety, operability, and minimum life cycle cost. the overall design, development, test and evaluation (ddt&e), production, and sustaining engineering efforts include activities performed by three organizations; the nasa design team (ndt), the upper stage production contractor (uspc) and the instrument unit production contractor (iupc). for clarity, the uspc will be referred to as the contractor throughout this document. nasa is responsible for the integration of the primary elements of the ares i launch vehicle including: the first stage, us including instrument unit (iu), and us engine; and will also integrate the ares i launch vehicle at the launch site. nasa is responsible for the ddt&e, including technical and programmatic integration of the us subsystems and government-furnished property. nasa will lead the effort to develop the requirements and specifications of the us element, the development plan and testing requirements, and all design documentation, initial manufacturing and assembly process planning, logistics planning, and operations support planning. development, qualification, and acceptance testing will be conducted by nasa and the contractor to satisfy requirements and for risk mitigation. nasa is responsible for the overall upper stage verification and validation process and will require support from the contractor. the contractor is responsible for the manufacture and assembly of the upper stage test flight and operational upper stage units including the installation of upper stage instrument unit, the government-furnished us engine, booster separation motors, and other government-furnished property. a description of the nasa managed and performed efforts is contained in the us work packages and will be made available to the contractor to ensure their understanding of the roles and responsibilities of the ndt, iupc, and contractor during the design, development, and operation of the us element. the us conceptual design described in the uso-clv-se-25704 us design definition document (ddd) is the baseline design for this contract. the contractors early role will be to provide producibility engineering support to nasa via the established us office structure and to provide inputs into the final design configuration, specifications, and standards. nasa will transition the manufacturing and assembly, logistics support infrastructure, configuration management, and the sustaining engineering functions to the contractor at the key points during the development and implementation of the program currently planned to occur no later than 90 days after the completion of the following major milestones: manufacturing and assembly us preliminary design review (pdr) logistics support infrastructure us pdr configuration management us critical design review cdr) sustaining engineering us design certification review (dcr) after the completion of an orderly transition of roles and responsibilities to the contractor, nasa will assume an insight role into the contractors production, sustaining engineering, and operations support of the ares i us test program and flight hardware. after dcr, the contractor will be responsible for sustaining engineering per sow section 4.7, as necessary to maintain and support the us configuration and for production and operations support.

Award Details

Awarding Agency National Aeronautics and Space Administration
Contract Type Contract
Period Jun 18, 2026

Recipient

Recipient name, address, UEI, and contact info are part of the Basic plan and above.
Upgrade to see who won

Place of Performance

City / State AL

Search Similar

Same in Alabama

Transaction History (showing 10 of 20)

Mod # Date Amount Action Type Description
Jun 18, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Jun 18, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Jun 17, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Jun 9, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
May 28, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
May 28, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
May 21, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
May 21, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
May 15, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Apr 30, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Apr 30, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Apr 22, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Apr 22, 2026 $10.5B Provide developmental hardware and test articles, and manufacture and assembl...
Mar 31, 2026 $8.3M Provide developmental hardware and test articles, and manufacture and assembl...
Mar 27, 2026 $43.6M Provide developmental hardware and test articles, and manufacture and assembl...
Mar 11, 2026 $4.0M Provide developmental hardware and test articles, and manufacture and assembl...
Feb 25, 2026 $7.3M Provide developmental hardware and test articles, and manufacture and assembl...
Jan 28, 2026 $12.8M Provide developmental hardware and test articles, and manufacture and assembl...
Nov 25, 2025 $94.4M Provide developmental hardware and test articles, and manufacture and assembl...
Nov 13, 2025 $3.0M Provide developmental hardware and test articles, and manufacture and assembl...

About This Contract

This contract was awarded to THE BOEING COMPANY (based in Alabama) by National Aeronautics and Space Administration. The award represents one of millions of federal procurement actions tracked through USASpending.gov, the official source of federal spending data.

The obligated amount is $10,510,304,426. Federal contract obligations represent funds committed by the government for goods or services. Actual outlays may differ if contract modifications, terminations, or scope changes occur during the period of performance.

The place of performance for this contract is Alabama. Federal contracts are distributed across all 50 states, with concentrations in defense corridors and metropolitan areas hosting major federal facilities.